2. SITE PLAN APPLICATION – 400 Main Street, Installation of a new electrical substation to an existing industrial manufacturing facility adjacent to the Pratt & Whitney Engineering Building.
Applicant: Edwin C. Rimpley, MACTEC Engineering & Consulting
3. SITE PLAN APPLICATION – 400 Main Street, a.k.a. Pratt & Whitney Building G, Installation of new windows, metal siding and construction of a new entrance to an existing industrial manufacturing facility.
Applicant: Donald P. Crowe AIA- The S/L/A/M Collaborative
4. SITE PLAN APPLICATION – 417 School Street, Installation of a chain link fence, underground propane tank and parking lot expansion, and associated storm water drainage to an existing industrial building.
Applicant: Zuvic Associates
5. SITE PLAN APPLICATION – 186 Brewer Street, Construction of a 5,670 square foot boat maintenance facility, parking lot and associated storm water drainage.
Applicant: Cabela’s Retail, Inc.
6. SOIL-EROSION AND SEDIMENTATION CONTROL APPLICATION: 186 Brewer Street, Construction of a 5,670 square foot boat maintenance facility, parking lot and associated storm water drainage
Applicant: Cabela's Retail, Inc.